SSD Modifications
Determination
MOD 7 - Bord and Pillar Mining of longwalls 201 and 202
Narrabri Shire
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Revised mining method for two of the approved longwall mining panels (201 and 202) from longwall to bord and pillar mining. The bord and pillar operations would occur concurrently with the existing Narrabri Mine longwall.